25 | On September 28, 2026, Licensing Program Analyst Aurelio Mendoza conducted an unannounced follow up case management inspection at the EUSD Preschool Program located at Rocky Hill Elementary School. Upon arrival, LPA Mendoza met with Staff 1, provided the reason for the unannounced inspection, and Staff 1 accompanied the LPA throughout the full indoor and outdoor walkthrough.
A census was taken during the inspection. Staff 1 stated that the current enrollment was 51 children, which was consistent with the number of children observed and staffing present.
During today’s walkthrough, LPA Mendoza re inspected all classrooms, the restroom areas, and the outdoor activity space. All restroom fixtures were tested and observed to be in proper working order, including 7 toilets, 7 sinks, and 4 urinals. Classroom sinks and the 2 outdoor sinks were also functioning. The facility continues to maintain adequate quantities and operability of all required fixtures needed to support the requested capacity of 96 children.
As documented during the inspection of August 24, 2026, the preschool program requested an increase in licensed capacity from 72 to 96 children across classrooms 52, 80, 81, and 82. Indoor measurements established a total usable area of 3,413 square feet, and the outdoor play area measured 9,324 square feet. Both measurements were sufficient for the increased capacity. At that time, the preschool program submitted waivers requesting shared use of the Kindergarten Playground and the Kindergarten Restrooms.
Both waivers were reviewed and formally approved on September 10, 2026. LPA Mendoza provided Staff 1 with signed copies of each waiver during today’s inspection and reviewed all associated conditions.
|